MRD Associates was selected under PC 16-021 PCMT for “Professional Design Services for the Panama City Marina T-Dock Bulkhead Evaluation and Rehabilitation Project”. The MRD Team consists of Read more
MRD Associates was selected under the RFSOQBDC02-15/16 for “Statewide Coastal Engineering Services”. The Department of Environmental Protection, Division of Recreation Services, Bureau of Design Read more
A Notice to Proceed has been issued for the Gator Lake Shoreline Stabilization Project that consists of the construction of four (4) breakwaters and a terminal groin. The erosion control project will Read more
MRD Associates has been asked to provide Coastal Engineering Services for the first beach renourishment event/Environmental Restoration Project along St. Joseph Peninsula, Gulf County Florida. The Read more
Michael Dombrowski of MRD Associates, Inc. presented the preliminary findings from the Southern Beach Erosion Control Project Feasibility Study on St. Joseph Peninsula, Gulf County, Florida. Michael Read more
MRD Associates, Inc. recently completed permitting services with the Federal Emergency Management Agency (FEMA) for the revision of the local Flood Insurance Rate Map (FIRM) for a section of Read more
Construction was recently completed on the 1,750 linear foot two-layer Geo-tube dune core, 20,000+ cubic yard dune restoration, 44,500 native dune plantings, and sand fencing project. The goal of Read more