MRD News

Latest and Historic News from MRD Associates, Inc.

MRD Conducts Metocean Data Collection Effort in NW Florida

- Posted in MRD News by
MRD Associates was recently tasked with deploying dual gimbal mounted ADCP’s within the Northwest Florida region for the purpose of ascertaining waves and currents. The data is to be used by a Read more

Panama City Marina T-Dock Bulkhead Restoration Awarded

- Posted in MRD News by
MRD Associates was selected under PC 16-021 PCMT for “Professional Design Services for the Panama City Marina T-Dock Bulkhead Evaluation and Rehabilitation Project”. The MRD Team consists of Read more

Statewide Professional Coastal Engineering Services Awarded

- Posted in MRD News by
MRD Associates was selected under the RFSOQBDC02-15/16 for “Statewide Coastal Engineering Services”. The Department of Environmental Protection, Division of Recreation Services, Bureau of Design Read more

Gator Lake Breakwaters Construction Commences

- Posted in MRD News by
A Notice to Proceed has been issued for the Gator Lake Shoreline Stabilization Project that consists of the construction of four (4) breakwaters and a terminal groin. The erosion control project will Read more

Shell Point Beach Restoration Project Awarded

- Posted in MRD News by
MRD Associates, Inc. (MRD), teamed with Ecology and Environmental (E&E) and Preble Rish, Inc. (PRI), were recently awarded the Shell Point Beach Restoration Project (RFSOQBDC03-14/15) located in Read more

St. Joseph Peninsula Beach Project Coastal Engineering Services

- Posted in MRD News by
MRD Associates has been asked to provide Coastal Engineering Services for the first beach renourishment event/Environmental Restoration Project along St. Joseph Peninsula, Gulf County Florida. The Read more

Michael Dombrowski Presents Preliminary Findings for the St. Joseph Peninsula Southern Beach Erosion Control Project to the SJP Coastal Community Association (CCA)

- Posted in MRD News by
Michael Dombrowski of MRD Associates, Inc. presented the preliminary findings from the Southern Beach Erosion Control Project Feasibility Study on St. Joseph Peninsula, Gulf County, Florida. Michael Read more

Stumphole Construction Concludes Protecting Vital Hurricane Evacuation Route.

- Posted in MRD News by
MRD Associates, Inc. successfully completed the restoration and construction of the Stumphole Revetment in Gulf County, Florida. This revetment is vital for protecting residents of St. Joseph Read more

Shell Point Included in Phase III NRDA Projects.

- Posted in MRD News by
Governor Rick Scott announced the third set of Natural Resource Damage Assessment (NRDA) restoration projects to mitigate damages from the Deepwater Horizon Oil Spill. Included in the 28 projects is Read more

MRD Participates in the Development of the Perdido Key Master Plan.

- Posted in MRD News by
MRD Associates, Inc. was part of the DP&Z team selected by Escambia County to prepare the Perdido Key Master Plan. MRD conducted an assessment of the existing and potential beach access sites Read more
Page 5 of 6