Six years after first applying for money to restore a locally popular stretch of beach along Apalachee Bay, the Shell Point Beach project is complete. The $550,000 project included renourishment of Read more
A Notice to Proceed has been issued for the Gator Lake Shoreline Stabilization Project that consists of the construction of four (4) breakwaters and a terminal groin. The erosion control project will Read more
MRD Associates, Inc. (MRD), teamed with Ecology and Environmental (E&E) and Preble Rish, Inc. (PRI), were recently awarded the Shell Point Beach Restoration Project (RFSOQBDC03-14/15) located in Read more
Michael Dombrowski of MRD Associates, Inc. presented the preliminary findings from the Southern Beach Erosion Control Project Feasibility Study on St. Joseph Peninsula, Gulf County, Florida. Michael Read more
The last of the 30,000 cubic yards of earthworks was graded, 21,500+ wetland plants installed, and 18,700 tons of Armor Stone placed to complete the mitigation project. The purpose of the project is Read more